New Formel D Site in Immendingen, Germany
The administration building and the first workshop area are being built on a company site of more than 6,000 m² (64,583 sq.ft.). The premises are big enough to potentially build three additional factory buildings. Thanks to the new stand-alone building and planning freedom, we are able to implement numerous other services and complete solutions in addition to peripheral services for testing. It also allows us to optimally align our new location to the diverse needs of our customers. Furthermore, the new site meets all important requirements for the future issues of electromobility, shared mobility, connectivity, and autonomous driving.
We attach great importance to energy efficiency and sustainability in the energy supply of our new location. The site is heated by a pellet heating system and is thus based on renewable energy sources. The administration building is also classified as a “KfW-Effizienzhaus 55” (energy-efficient building), which means that we only use the most modern technologies for energy requirements in Immendingen.
Key Facts
Our Range of Services
Product Development
- Vehicle preparation
- Installation of measurement equipment and sensor technology
- Development and commissioning of prototypes and preliminary test models
- Camouflage management
- Test drives
- Fleet management of test vehicles
Production
- Value-added warehousing
- Control and rework
- Troubleshooting
- Interim/shop floor management
- Quality services
- Quality training
Aftersales
- Technical documentation
- Determination of labor time
- Field analyses
- Technical support
- Vehicle upgrading
- Preparation of show or press vehicles
- Fleet management
How to Find Us
Our new site in Immendingen particularly stands out due to its close proximity to the Daimler Test and Technology Center and can be easily reached via A81 (Geisingen exit).